View Resolution

Resolution Urging the Public Service Commission to Take Up the Investigation of Outages and Damages to Electrical Systems in ANC 3/4G on August 1 and 2, 2025 (EDocket GD2025-01-E)
Ward 3
3G
Lisa Gore and Laura Phinizy
()
Resolution
6521 Barnaby Street NW Washington, DC 20015
6/6/2026 7:41:39 PM
Description
That ANC 3/4G urges the Public Service Commission to conduct a formal investigation into the unplanned outages of electricity service provided by PEPCO and resulting power surges that occurred on 8/1-2 in ANC 3/4G (Wards 3 and 4), and its impact on the reliability and safety of service in the affected area. • That such investigation include 1) investigation of the causes of the electric service outages and the power surges that occurred upon restoration of power, (2) the condition of the system infrastructure in the affected areas, (3) the corrective action necessary to enable the provision of safe and reliable service to these DC residents, (4) PEPCO's efforts to resolve this problem, and (5) PEPCO's efforts to compensate its DC residential customers for their losses resulting from PEPCO provided electric service. That our affected residents be presented with equitable resolution of this matter, including fair compensation and remedies for the damages they have suffered.
Uploaded Files
Comments

Comments

Resolution:
Sub title:
Agency:
1000 characters left
Save comment